New Pacific Metals files technical report on Silver Sand project in Bolivia

Silver Sand is located in approximately 25 kilometres northeast of the renowned Cerro Rico silver and base metal mineral system near Potosi, Bolivia. According to the report, the deposit contains 35.4 million tons in the measured and indicated category grading at 137 grams per ton silver for a total of 155.9 million ounces of silver. The project also has 9.8 million tons at 112 grams per ton silver for 35.6 million ounces in the inferred category. Nearly 70% of the resources are found within 200 metres of the conceptual open pit surface.

Source: Proactiveinvestors.com